Online Sunshine Logo
Official Internet Site of the Florida Legislature
March 29, 2024
Text: 'NEW Advanced Legislative Search'
Interpreter Services for the Deaf and Hard of Hearing
Go to MyFlorida House
Go to MyFlorida House
Select Year:  
The Florida Statutes

The 2023 Florida Statutes (including Special Session C)

Title XXIX
PUBLIC HEALTH
Chapter 403
ENVIRONMENTAL CONTROL
View Entire Chapter
F.S. 403.94055
403.94055 Application contents; corridor requirements.
(1) A natural gas transmission pipeline company may file an application encompassing all or a part of one or more proposed pipelines. The beginning and ending points of a pipeline must be specified in the application and must be verified by the commission in its determination of need. The application must include all structures and maintenance and access roads required to be constructed. The applicant may include metering and compressor stations and other facilities directly related to the transportation of natural gas which will serve the pipeline.
(2) The width of the corridor may be the width of the pipeline right-of-way or wider, but may not exceed 1/3 mile. After the property interests required for the pipeline right-of-way have been acquired by the applicant, the boundaries of the corridor shall be narrowed to include only that land within pipeline right-of-way. The corridor must be specified in the application, in amendments to the application filed pursuant to s. 403.9413, and in notices of acceptance of alternate corridors filed by an applicant and the department pursuant to s. 403.9412.
History.s. 1, ch. 92-284.