Community Budget Issue Requests - Tracking Id #905FY0102

Indian River Lagoon Initiative

 

 

 

 

 

 

 

 

 

 

Requester:

Michael Slayton

Organization:

SJRWMD

 

 

 

 

 

 

 

 

 

 

Project Title:

Indian River Lagoon Initiative

Date Submitted:

1/16/2002 9:41:24 AM

 

 

 

 

 

 

 

 

 

 

Sponsors:

Bob Allen

 

 

 

 

 

 

 

 

 

 

Statewide Interest:

 

 

 

 

 

 

 

This project addresses improving water quality, at a minim, as it relates to the biological productivity and diversity of the lagoon. The lagoon provides 50% of the east coast Florida fish catch and 90% of Florida's clam harvest. In addition, the lagoon is designated a priority water body under the 1987 Surface Water Improvement and Management Act.

 

 

 

 

 

 

 

 

 

 

Recipient:

St. Johns River Water Mgmt District

 

Contact:

Michael Slayton

 

 

PO Box 1429

 

Contact Phone:

(321) 722-5364

 

 

 

Palatka 32178-1429

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Counties:

Brevard

 

 

 

 

 

 

 

 

 

 

Gov't Entity:

Yes

Private Organization (Profit/Not for Profit):

 

 

 

 

 

 

 

 

 

 

 

 

Project Description:

 

 

 

 

 

 

 

The Indian River Lagoon Initiative is an ongoing project to restore, and enhance the lagoon and its tributaries. Funding through this initiative will help to restore and enhance the lagoon. Examples of subprojects that could be funded through this request follow. This list is in alphabetical order and is not a complete listing.

-C-1 Rediversion-Turkey Creek Basin

-Cooperative Surface Water Program-Sebastian River Water Control District

-Local Govt Cooperative Stormwater Programs-Sebastian River Basin

-Local Govt Stormwater Programs-Other priority basins

-Regional Surface Water Programs-Indian River Farms Water Control District

-Rehabilitation of Coastal Wetland habitat

-Restudy of Northern Reaches

-Sebastian River Muck Removal

-Wetland and Shoreline Habitat Creation or Enhancement

-Wetland Initiative in the Merritt Island National Wildlife Refuge

 

 

 

 

 

 

 

 

 

 

Measurable Outcome Anticipated:

 

 

 

 

 

Less freshwater run-off to the lagoon; number of reconnected mosquito impoundments; number of cubic yards of muck removed from the Sebastian River; stormwater treatment/management and surface water treatment facilities; improved water quality in the lagoon and tributaries(e.g. less nutrients, improved dissolved oxygen levels); acres of seagrass; number of completed and implemented local and regional surface water managemnet plans and projects addressing pollution load reduction goals and total maximum daily loads.

 

 

 

 

 

 

 

 

 

 

Amount requested from the State for this project this year:

$8,000,000

 

 

 

 

 

 

 

 

 

 

Identify items(s) in the FY 2002-03 Appropriations Bill to be reduced:

 

 

 

 

 

 

 

 

 

 

 

 

 

Specific Appropriation #:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Specific Appropriation Title:

 

 

 

 

 

 

 

 

 

 

 

Amount to be reduced:

$

 

 

 

 

 

 

 

 

 

 

 

 

 

Total cost of the project:

$132,949,000

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Request has been made to fund:

Operations and Construction

 

 

 

 

 

 

 

 

 

 

 

 

 

What type of match exists for this project?

Local, Federal

 

 

Cash Amount:

$72,161,450

 

 

 

 

 

 

 

 

 

 

 

 

 

Was this project previously funded by the State?

 

Yes

 

 

Fiscal Year:

2001-2002

Amount:

$4,000,000

 

 

 

 

 

 

 

 

 

 

 

Is future-year funding likely to be requested?

 

Yes

 

 

Amount:

$60,787,950

 

 

 

 

 

 

Purpose for future year funding:

 

Recurring Operations and Non-recurring Construction

 

 

Will this be an annual request?

 

 

Yes

 

 

 

 

 

 

 

 

 

 

 

 

Was this project included in an Agency's Budget Request?

 

Unknown

 

 

 

 

 

 

 

 

 

 

 

Was this project included in the Governor's Recommended Budget?

Unknown

 

 

 

 

 

 

 

 

 

 

 

Is there a documented need for this project?

 

Yes

 

 

Documentation:

National Estuary Program's Comprehensive Conservation and Management Plan, SWIM Plan, and District

 

 

 

 

 

 

 

 

 

 

Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)?

Yes

 

 

Hearing Body:

Advisory and Governing Board of SJRWMD

 

Meeting Date:

10/9/2001