Community Budget Issue Requests - Tracking Id #1148FY0102

C-9 East Basin Retrofit (Brentwood/Leslie Area)

 

 

 

 

 

 

 

 

 

 

Requester:

Miami-Dade County Miami-Dade County

Organization:

Department of Environmental Resources Management

 

 

 

 

 

 

 

 

 

 

Project Title:

C-9 East Basin Retrofit (Brentwood/Leslie Area)

Date Submitted:

1/18/2002 11:38:49 AM

 

 

 

 

 

 

 

 

 

 

Sponsors:

Wilbert Holloway

 

 

 

 

 

 

 

 

 

 

Statewide Interest:

 

 

 

 

 

 

 

Extensive land development and the construction of a complex canal system have caused an increase in the volume and discharge rate of surface water runoff from the land, and have resulted in the deterioration of the stormwater runoff to Biscayne Bay, which has been designated an "Outstanding Florida Water" by the State.  The basin is listed as impaired (303s list) waters and in need of restoration in the State of Florida.  Parameters of concern in this water body are dissolved oxygen, nutrients and mercury.  This project will effectively reduce the discharge of pollutants into the integral portions of the C-9 canal system.

 

 

 

 

 

 

 

 

 

 

Recipient:

Miami-Dade County DERM

 

Contact:

Rana Brown

 

 

33 SW 2nd Avenue

 

Contact Phone:

(305) 375-2494

 

 

 

Miami 33130

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Counties:

Dade

 

 

 

 

 

 

 

 

 

 

Gov't Entity:

Yes

Private Organization (Profit/Not for Profit):

 

 

 

 

 

 

 

 

 

 

 

 

Project Description:

 

 

 

 

 

 

 

The proposed drainage improvements consist of the installation of drain system along N.W. 32nd Avenue, N.W. 191st Street, and N.W. 27th Court, with emergency overflows provided by the construction of a new outfall to the Carol City canal and connections to three existing outfalls.  In addition, flooding problems in the Leslie Estates area will be addressed by the installation of french drains, with connections to two existing outfalls to the Carol City canal.  Discharge to the outfalls will only occur during extreme events and after compliance with current water quality regulations.

 

 

 

 

 

 

 

 

 

 

Measurable Outcome Anticipated:

 

 

 

 

 

The basin is listed as impaired (303d list) waters and in need of restoration in the State of Florida.  Parameters of concern in this water body are dissolved oxygen (DO), nutrients, and mercury.  The retrofitting of the drainage systems in C-9 East effectively reduces the discharge of oxygen-demanding substances and nutrients into integral portions of the C-9 canal system.  The retrofitting sets a limit to the pollutant loading that can be conveyed into the water body.

 

 

 

 

 

 

 

 

 

 

Amount requested from the State for this project this year:

$700,000

 

 

 

 

 

 

 

 

 

 

Identify items(s) in the FY 2002-03 Appropriations Bill to be reduced:

 

 

 

 

 

 

 

 

 

 

 

 

 

Specific Appropriation #:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Specific Appropriation Title:

 

 

 

 

 

 

 

 

 

 

 

Amount to be reduced:

$

 

 

 

 

 

 

 

 

 

 

 

 

 

Total cost of the project:

$1,449,093

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Request has been made to fund:

Construction

 

 

 

 

 

 

 

 

 

 

 

 

 

What type of match exists for this project?

Local

 

 

Cash Amount:

$749,093

 

 

 

 

 

 

 

 

 

 

 

 

 

Was this project previously funded by the State?

 

No

 

 

 

 

 

 

 

 

 

 

 

Is future-year funding likely to be requested?

 

Unknown

 

 

 

 

 

 

 

 

 

 

 

Was this project included in an Agency's Budget Request?

 

Yes

 

 

Agency:

Environmental Protection, Department Of

 

 

 

 

 

 

 

 

 

 

Was this project included in the Governor's Recommended Budget?

Yes

 

 

 

 

 

 

 

 

 

 

 

Is there a documented need for this project?

 

Yes

 

 

Documentation:

County field investigations of flood complaints and assesments info. from plats & topographic survey

 

 

 

 

 

 

 

 

 

 

Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)?

Yes

 

 

Hearing Body:

Miami-Dade Board of County Commissioners; Miami-Dade Delegation

 

Meeting Date:

11/19/2001